Requirements for activated alumina in sewage treatment

Jan 11, 2022

The primary targets of the active characteristics of activated alumina are pore volume and specific surface area. When these two parameters are high, the activity is generally considered to be high. There has been a high level of attention to activity. Generally, the preparation of raw materials, the ratio of raw materials during molding, the selection of other aids, the molding process, drying and activation roasting processes are strictly controlled to ensure and improve the activity of activated alumina. Activated alumina has good adsorption capacity and can adsorb pollutants in the air and even water, so it has a very important position in wastewater treatment. The following editor will introduce the requirements of activated alumina adsorbent in sewage treatment.

1. In strict accordance with the national solid waste management regulations and relevant regulations, further standardize the online monitoring of hazardous waste, the disposal and management of solid waste and sludge, reduce the sludge stacking time, ensure that the sewage treatment plant meets the corresponding exhaust gas standards, and establish Sludge clearing account records.

2. Strengthen the operation management of online monitoring equipment to ensure the normal operation of the instrument, accurate data transmission, and record the operation account of the online monitoring system of the sewage treatment plant. If there is any report, it should be reported in time and the cause should be found for repair.

3. Activated alumina is a supplement to the "environmental assessment approval" and the investigation of the urban planning department to ensure proper sanitation protection, long-distance protection, and avoid construction of residential projects.

4. Strengthen equipment noise control measures, close the noise in the blower room and dehydration workshop, and further reduce the impact of noise on the surrounding environment.

5. Activated alumina is the relevant material accepted by the sewage pipe network construction engineer of the supplementary project.

6. Strengthen laboratory and online monitoring of waste collection, temporary storage and disposal measures, and establish corresponding accounts. At the same time, strengthen laboratory analysis and online monitoring system operation management personnel training, and strictly standardize management.

7. It is to strengthen the inspection and maintenance of sewage pipe network, and establish the identification of activated alumina adsorbent sewage pipe network facilities to prevent misuse and misuse. Indicators unstable emission rectification.

8. It is to strengthen the daily management of the environment, improve the rules and regulations, strengthen the daily operation of the facility management and maintenance for the operation of the activated alumina adsorbent sewage treatment plant, and strictly enforce the operating procedures to ensure the normal operation of the facilities and ensure the discharge of pollutants to prevent pollution incidents. .